Confidential mandate
Chief Operating Officer — Interim, Wind Asset Management
Urgent / Replacement
Turbine availability has deteriorated after an OEM service collapse, requiring a fifteen-month interim COO to restore generation, rebuild maintenance capability and transfer resilient asset operations.
The mandate
The principal turbine OEM withdrew service after a contractual dispute, leaving critical spares and specialist maintenance unavailable across 1.8 GW. The COO resigned when availability dropped below eighty-nine per cent and insurers challenged maintenance records.
The interim must start within two weeks for fifteen months through service insourcing, peak wind season and contract resolution. Permanent recruitment begins after availability exceeds target for one quarter, with eight weeks for transition.
Handover requires technical availability above ninety-six per cent for six months, critical spares coverage above ninety-five per cent, all statutory inspections current, and the successor commanding one fleet-wide severe-weather exercise.
The COO may prioritise turbines, procure emergency services below ₹1 crore and restrict unsafe equipment. OEM settlement, major component capital above ₹5 crore and permanent regional hires require board approval; grid dispatch and insurer claim decisions retain their statutory or contractual owners.
New project construction, power trading and repowering investment are excluded. The mandate restores dependable operation of the existing fleet.
Why this seat is open
OEM withdrawal exposed an asset model overly dependent on one external capability. Availability decline and incomplete records now threaten revenue and insurance coverage together. A temporary COO must create self-sufficient maintenance before a permanent operator inherits the fleet.
What you will own
- Rank turbine losses by energy, safety, fault recurrence, access and repair-resource requirement.
- Decide repair and spares allocation across sites using forecast wind and component-risk evidence.
- Build internal capability for diagnostics, major corrective work, planning and technical documentation.
- Qualify independent service partners without losing configuration or warranty evidence.
- Restore statutory inspection, work-order and component-history records across the fleet.
- Establish daily energy-availability control separating grid, weather, access and technical loss.
- Transfer fleet strategy and severe-weather command after six months of target availability.
Candidate qualifications
- More than twenty-two years in wind, power generation or rotating-equipment asset operations.
- Recovered a multi-site fleet after OEM withdrawal, major contractor failure or chronic availability loss.
- Strong command of turbine diagnostics, major components, spares, access planning and performance analytics.
- Experience building internal maintenance while controlling third-party technical and safety risk.
- Demonstrated availability improvement verified against energy and exclusions, not headline mechanical uptime alone.
- Ability to negotiate with OEMs, insurers and lenders while protecting immediate asset integrity.
Non-negotiables
- Available in Chennai within two weeks and for frequent remote-site travel.
- No current relationship with the disputed OEM or alternate service bidders.
- Prepared to restrict turbines where inspection or component evidence is inadequate.
- Can commit for fifteen months and permanent-COO overlap.
- 49 words maximum. Confirm your earliest Chennai start and readiness for remote wind-site travel.
- 49 words maximum. What fleet availability did you restore after OEM or service-provider failure?
- 49 words maximum. Which maintenance capability did you insource first, and what evidence proved readiness?
This mandate is confidential. The client is named only under a mutual NDA, and your own record is never listed, sold or shown to a company under your name until you release it for this specific mandate.