Confidential mandate
Commissioning Readiness Recovery Authority — Water Treatment
Planned Hiring / New
Commissioning Readiness Recovery Authority mandate in Toronto, Canada · Municipal Water Treatment
A Toronto water-technology operator needs a ten-month recovery authority after reported mechanical completion outpaced process, operator and permit readiness across a major municipal treatment-plant expansion.
The mandate
Construction reports high mechanical completion, but process sequences, laboratory capacity, chemical logistics, maintenance plans and operator responses remain uneven across commissioned systems. Open deficiencies are counted rather than ranked by water-quality consequence, and project teams are preparing to demobilise before seasonal source-water conditions test the design. The commissioning director was removed after an integrated trial failed without an agreed abort or recovery path.
The interim takes commissioning authority within one week for ten months, covering readiness rebaseline, phased wet commissioning, five integrated trials, regulatory witness support, operational transfer and permanent appointee induction. A design change, deficiency, control-loop failure, sample anomaly, chemical interruption or source-water shift becomes a governed readiness event. Six final weeks are reserved for independent successor command and evidence closure.
Handover requires system boundaries, prerequisite evidence, approved procedures, competent shift coverage, laboratory and chemical readiness, control-room decision paths, maintenance ownership, performance-test criteria, abort logic and residual-deficiency governance. The successor must command an unseen high-turbidity event combined with analyser failure, maintain compliant water through the existing works and decide whether the expansion remains online without the interim.
The authority may stop a commissioning stage, reject mechanical handover, reprioritise contractor closure, impose temporary operating limits, replace temporary system leads and control CA$180 million of authorised completion funding. Accountable engineers approve designs; the municipal operator owns public service; environmental specialists interpret permit conditions. Material scope change, permanent acceptance and operation outside approved limits require oversight-committee approval.
The remit excludes construction claims, design certification, regulatory negotiation, permanent staffing, water tariff decisions, distribution-network optimisation and unrelated legacy-plant improvement. The interim cannot sign engineering assurance, predetermine permit acceptance, sacrifice existing treatment resilience for project schedule or allow contractor demobilisation before operating teams possess complete evidence and recoverable control.
Why this seat is open
The commissioning director was removed after an integrated run exposed missing operational prerequisites behind strong construction completion figures. Temporary authority must reset entry gates before seasonal water conditions and contractor demobilisation narrow the window, while a permanent leader is recruited to inherit a demonstrably controllable plant.
What you will own
- Rebaseline every system against mechanical, process, control, operator, laboratory, chemical, maintenance and permit prerequisites.
- Rank deficiencies by water-quality, safety, operability, recovery and performance-test consequence rather than numeric closure.
- Define wet-commissioning stages with entry evidence, abort points, fallback operation, recovery steps and accountable decisions.
- Coordinate existing-plant capacity and expansion trials without weakening continuity of compliant public water supply.
- Direct authorised contractor, specialist and commissioning resources toward binding integrated-readiness constraints.
- Lead five trials involving turbidity shift, analyser failure, chemical disruption, control-loop instability and power loss.
- Transfer commissioning command after the successor independently governs an unfamiliar water-quality disturbance.
Candidate qualifications
- Held commissioning or plant-operations authority for major water, wastewater or comparable continuous-process infrastructure.
- Recovered projects where mechanical completion obscured weak process, laboratory, maintenance and operator readiness.
- Designed integrated, evidence-led entry, abort, fallback and acceptance gates around public-service and permit constraints.
- Coordinated contractors and operators without taking accountable engineering or regulatory interpretation authority.
- Protected existing treatment resilience while testing new systems under adverse source-water conditions.
- Handed commissioning control to permanent leadership through a live performance run and independently managed unseen water-quality disturbance.
Non-negotiables
- Available within one week for Toronto authority, ten system residencies and five integrated trials.
- Direct treatment-plant commissioning recovery is required; construction project controls alone are insufficient.
- Will disclose constructors, engineering firms, equipment suppliers, municipalities and environmental advisers.
- Will not certify design, settle claims, negotiate permits, set tariffs, approve permanent acceptance or breach limits.
- 49 words maximum. Describe a project whose mechanical completion concealed weak operating readiness.
- 49 words maximum. How did you protect an existing public service during adverse commissioning trials?
- 49 words maximum. Confirm Toronto availability and the last integrated water-process start-up you commanded.
This mandate is confidential. The client is named only under a mutual NDA, and your own record is never listed, sold or shown to a company under your name until you release it for this specific mandate.