Confidential mandate

Highway Incident-Clearance Recovery Leader

Urgent / Unplanned

Highway Incident-Clearance Recovery Leader mandate in Indianapolis, United States · Statewide Highway Incident Management

An Indiana road authority needs a nine-month executive after prolonged truck-incident closures exposed fragmented heavy recovery, cargo removal, infrastructure inspection and corridor-reopening command across statewide operations.

The mandate

Three recent commercial-vehicle incidents remained on the network for hours after life-safety response had stabilised. A loaded combination required equipment larger than the tower originally called; another scene waited for a consignee to decide where damaged cargo could go; and a bridge strike cleared physically before the road authority had an accepted structural status. Police, fire, medical, environmental, towing, carrier and highway teams acted within their own responsibilities, but nobody held the operational chain from scene release through heavy recovery, cargo removal, road repair and verified lane reopening. The operations director resigned after a review found that reported clearance times excluded long periods between agencies.

The successful executive must occupy the Indianapolis control seat within ten days and join the next qualifying incident under the existing incident commander. Five days are reserved to reconstruct the 25 longest closures from first detection to final residual-work handoff, including clocks that stopped at responder, tow or maintenance boundaries. By day 21, each corridor will carry a response profile for vehicle class, load condition, recovery geometry, transload need, spill or battery hazard, pavement or structure consequence, likely destination and contracted resource time. The leader then runs this model through winter weather, a major construction diversion and the state’s peak freight period. Permanent recruitment begins after the first three live recoveries expose the authority the role actually needs.

Transfer is complete only after ten consecutive qualifying incidents have one continuous decision history; specialist recovery and cargo resources meet the agreed mobilisation test; reopening is recorded by lane and direction after authorised infrastructure and scene releases; and residual barrier, pavement, environmental, vehicle, cargo or claim work has a named owner outside the traffic clock. The successor must command two multi-agency exercises—an overturned tanker beneath a constrained overpass and an electric heavy vehicle with damaged load—then lead three live post-incident conferences without the interim. The handover will preserve corridor profiles, contractor performance, escalation contacts, unresolved commercial dependencies and a 120-day seasonal readiness agenda.

Within delegation, the interim may activate prequalified heavy-recovery and transload providers, reserve scarce recovery assets for defined corridors, direct road-authority maintenance and traffic-information teams, establish authority staging points, require an unsupported reopening forecast to be withdrawn, approve temporary service capacity and commit recovery expenditure up to USD 38 million. Police, fire and emergency medical commanders retain scene and life-safety authority; environmental and hazardous-material specialists control their releases; authorised bridge, pavement and electrical professionals determine infrastructure condition; carriers and cargo owners decide lawful cargo disposition; law enforcement and insurers control investigation and liability. Permanent awards, appointments and spending above delegation remain reserved.

Crash investigation, rescue, medical triage, hazardous-material classification, environmental clearance, vehicle roadworthiness, bridge certification, cargo ownership, insurance settlement, prosecution, statutory traffic direction and permanent highway design are outside this assignment. The executive cannot manufacture faster clearance by starting recovery inside an unreleased scene, pressuring a professional sign-off, sending damaged cargo to an unauthorised location, counting shoulder storage as completion or stopping the clock at first-lane opening while blocked lanes and unsafe debris remain. This remit joins authorised decisions into safe network restoration; it does not displace them.

Why this seat is open

The authority’s former operations leader managed normal maintenance and control-room performance but left after the independent incident review exposed unmanaged time between emergency release, specialist recovery, cargo decisions and infrastructure acceptance. District teams can mobilise local resources, yet the heaviest incidents cross contracts, jurisdictions and scarce statewide capability. A temporary executive is required through one demanding weather-and-freight cycle while the commissioner defines and recruits the permanent command.

What you will own

  • Establish an end-to-end incident clock from detection, verification and responder arrival through scene release, recovery mobilisation, cargo action, infrastructure acceptance, lane opening and residual-work transfer.
  • Classify corridor recovery need by vehicle and load, position, recovery geometry, access, lifting and transload demand, hazard dependencies, road damage and feasible destination before a provider is treated as ready.
  • Govern activation and performance of heavy towing, rotator, crane, transload, cleanup and emergency-repair capacity without crossing scene-command, professional-release, cargo or investigative authority.
  • Direct the road authority’s control-room, district, maintenance, staging and public traffic-information actions against one accepted forecast, including diversion consequence and changes to lane-by-lane availability.
  • Resolve commercial dependencies with carriers, cargo owners, terminals, recovery yards and insurers early enough that lawful destination or payment uncertainty does not silently hold the physical scene.
  • Exercise an overturned tanker under a restricted overpass and a damaged electric heavy vehicle, measuring decision latency, mobilisation reality, safety holds, network consequence and restoration evidence.
  • Install the permanent leader through live incident conferences, contractor challenge, corridor-readiness review and written acceptance of remaining seasonal, infrastructure and commercial risks.

Candidate qualifications

  • Held executive highway incident, motorway operations, heavy-vehicle recovery, toll-road service or comparable multi-agency network-restoration authority across a large road system.
  • Has shortened complex lane closures involving heavy recovery, displaced cargo, hazardous dependencies and damaged infrastructure without intruding on emergency or professional judgement.
  • Understands rotators, cranes, uprighting, transload, recovery geometry, commercial-vehicle loads, staging, road repair, lane protection, diversion and contractor mobilisation operationally.
  • Can connect police, fire, medical, environmental, highway, towing, carrier and engineering actions while preserving each organisation’s statutory and professional authority.
  • Has exposed misleading clearance performance caused by clocks ending at first response, scene release, tow arrival or first-lane opening rather than verified network restoration.
  • Completed permanent handover after live incidents and compound exercises, leaving tested corridor profiles, provider evidence, escalation rules and successor-led review.

Non-negotiables

  • Can start onsite in Indianapolis within ten days and sustain approximately forty-five percent control-room, district, roadside, recovery-yard and multi-agency exercise travel.
  • Brings direct highway incident or heavy commercial-vehicle recovery command; general fleet, warehousing or emergency-planning experience alone is insufficient.
  • Will disclose towing, recovery, crane, trucking, cargo, highway-contractor, insurer, engineering, technology and relevant investment relationships before appointment.
  • Accepts no scene-command, rescue, clinical, hazard-classification, environmental-release, structural-certification, traffic-policing, cargo-disposition, investigative, prosecutorial or claims authority.
  1. 49 words maximum. Describe a heavy-vehicle incident whose longest avoidable delay began after emergency scene stabilisation.
  2. 49 words maximum. Which timestamp would you use to prevent first-lane opening from overstating complete corridor restoration?
  3. 49 words maximum. What towing, recovery, trucking, engineering, insurer or highway-contractor relationship could impair your independence?

This mandate is confidential. The client is named only under a mutual NDA, and your own record is never listed, sold or shown to a company under your name until you release it for this specific mandate.