Confidential mandate
Cable-Landing Interconnection Recovery Leader
Urgent / Replacement
Cable-Landing Interconnection Recovery Leader mandate in Chennai, India · International Carrier Infrastructure
A regional carrier needs a fourteen-month executive to lead interconnection operations at its busiest Indian cable landing station.
The mandate
The Chennai landing station requires strengthened interconnection management to support priority customer commitments. The role will ensure cross-connect documentation, optical margin records and restoration procedures are current and tested, with accountable processes that reduce single-person dependencies and verify that contractual restoration promises align with physical route diversity and generator sequencing protocols.
The interim must assume the Chennai seat within fifteen days and lead for fourteen months. A permanent regional interconnection search will start once power, facility and backhaul dependencies have been reconciled across both Indian landing locations, forecast for month seven. At least six weeks of overlap will let the selected successor command a maintenance window and an unannounced continuity drill.
Handover requires verified end-to-end diversity for every priority service, dual-source station power to complete full-load transfer tests, spares and optical recovery paths to meet agreed restoration windows, two multi-failure exercises to finish without undocumented manual workarounds, and the successor to sign the capacity, maintenance and escalation registers. Restoring aggregate bandwidth without service-level evidence is not completion.
The interim may halt maintenance, reroute capacity, set restoration priorities, change temporary operating procedures, redeploy existing staff and approve up to ₹40 crore within the board-authorised recovery plan. New long-term capacity contracts, permanent hires, route sales, structural workforce changes and single decisions above ₹8 crore require network chief or committee approval. The seat cannot direct marine vessels outside contracted emergency protocols.
International capacity sales, consumer access-network performance, new cable investment and general corporate cybersecurity are expressly out of scope. The mandate owns landing-station power and optical readiness, terrestrial interconnection, physical route evidence, restoration command, partner escalation and the operating capability required to survive overlapping faults.
Why this seat is open
The outage showed that nominal route diversity ended at shared power, backhaul and operational knowledge, and the executive removal left a fragmented restoration chain. Carrier customers are demanding auditable remedies before renewing protected-capacity commitments. The group needs a temporary leader who can exercise the physical system under stress and induct permanent ownership without disrupting active marine schedules.
What you will own
- Reconstruct the failure across utility feeds, switchgear, generators, cooling, optical terminal equipment, cross-connects, terrestrial paths and control-room decisions.
- Trace priority circuits through wet segment, landing equipment, meet-me rooms, backhaul, peering and customer handoff to expose hidden common points.
- Decide restoration classes, protected-capacity reservations, spares positions and maintenance collision rules using contracted customer consequence.
- Commission full-load power transfers and optical recovery tests with safe rollback, witnessed measurements and defect ownership.
- Establish one regional maintenance calendar joining marine work, terrestrial changes, station interventions, capacity loans and embargo periods.
- Command multi-failure exercises involving station isolation, backhaul cut, optical degradation, staff unavailability and partner escalation across borders.
- Transfer route maps, measured margins, customer obligations, spares, permits, unresolved defects and command routines through successor-led operations.
Candidate qualifications
- Held senior operational authority for international cable landing, optical transmission or carrier interconnection across multiple jurisdictions.
- Recovered a landing station or long-haul network from compounded power, optical, backhaul or maintenance failures under customer pressure.
- Verified physical path diversity from wet segment through terrestrial handoff instead of accepting logical circuit labels as proof.
- Led high-risk power and transmission exercises with formal safety controls, rollback criteria and independent witnessing.
- Negotiated restoration priorities among consortium parties, terrestrial carriers, facilities operators and customers holding conflicting contractual positions.
- Handed a network-recovery command to permanent leadership using observed maintenance and incident decisions rather than static runbooks.
More seats like this one
This mandate is confidential. The client is named only under a mutual NDA, and your own record is never listed, sold or shown to a company under your name until you release it for this specific mandate.