01
Which industrial future does the capacity proposal describe?
I would compare the fictional JPY 7.4 billion dedicated-volume proposal with JPY 4.6 billion for flexible assembly, beginning with the different customer work each would support. The session would retain Takuma Nagisawa’s argument for focus and scale, the narrower volume opportunity given up and the professional authority behind technical validation. Participants would examine why the JPY 2.8 billion budget difference cannot be called a realised saving when scope and product mix differ. I would not prescribe equipment, certify capability or claim that flexibility is always the better industrial model. An actual discussion would require verified investment definitions and permission to describe the alternatives. The intended contribution is a more exact relationship between direction and assets, with the strategic choice made before the largest output number dominates the account. This is a proposed fictional session, not a delivered engagement or a substitute for engineering, safety or capital-approval processes inside a real manufacturer.