Case 01
The workstation had to become smaller before its catalogue could become more ambitious
In 2023, a proposed receiving workstation at Pravellen had a depth of 750 millimetres. Research at forty-two laboratories found that thirty-one had available bench depth of six hundred millimetres or less. The catalogue sponsor wanted to retain the larger arrangement because it accommodated more functions in one model. Anagha Vervankar asked whether that specification could become a usable product in the settings the research had actually described.
I chose a 580-millimetre design for further evaluation and accepted a narrower physical arrangement. The decision did not mean every bench deeper than the product would necessarily be suitable. Clearances, access and the intended workflow still required assessment by the relevant specialists and the site. I wanted the dimensional constraint to influence the product brief before customers were asked to solve it through changes to their workplace.
₹9.6 crore supported the product programme. Engineering retained design and technical evaluation, with quality, regulatory and clinical assessments separately owned where applicable. Sixteen sites participated in fit reviews. Eleven accepted the proposed arrangement in their reviewed circumstances; five needed another configuration. Those five remained outside the positive account rather than being described as future adopters whose agreement was assumed.
The result was a bounded fit decision. It established neither clinical performance nor regulatory clearance, and it did not show that every laboratory in the research group could use the revised model. We gave up the convenience of a single expansive catalogue proposition and accepted the need to explain which settings it served. The expense was not a measured saving or a claimed return on investment.
I would bring workplace dimensions into the product discussion earlier in a similar programme. The relevant lesson is not that the smallest equipment is always preferable. It is that a feature arrangement has little value to a buyer if the physical assumptions behind it remain incompatible with the intended setting. Product leadership needs to make that incompatibility a choice about scope, rather than leave installation colleagues to discover it after the offer has been accepted.