Qingshu GuoChief Operating Officer

The person behind the perspective

I learned to examine what the operating promise depends on.

I began as a utilities engineer, with a practical interest in the work that allowed other people’s plans to happen. Production schedules were visible and closely discussed. The supporting work could be less visible until something was missing: an identified spare, an agreed access period, a decision about ownership or the person who knew how a particular arrangement was maintained. I learned that an operating plan can be ambitious and still be incomplete if it leaves those conditions outside the conversation.

After completing mechanical engineering at the fictional Qiravelle Institute in June 1993, I joined Nanshivera Medicines in July. My early role involved utilities records, maintenance preparation and support for experienced engineers. I did not have authority to approve manufacturing changes or product release. The work taught me to distinguish a recorded asset from an asset whose support conditions were understood. A drawing, a stores entry and a supervisor’s knowledge could each describe a different part of the same equipment. Asking how those accounts connected was often more useful than asking which report was most recent.

In June 1999 I became a maintenance planning manager. I worked with twenty-two colleagues and three team leads, arranging support work around the plant’s operating commitments. I initially tried to improve the management account by making every request fit a consistent ageing scorecard. The report made aggregation easier but did not help supervisors distinguish an access decision from a technical priority. In a 2004 trial across two areas, we redesigned the account around the reason work was waiting and the person able to move it forward. I had to acknowledge that my own reporting design had contributed to the delay.

I joined Lanshivera Therapeutics as head of plant services in September 2006. The larger site gave me responsibility for engineering support, maintenance planning and the practical relationship between stores and operating needs. A 2010 review of ninety-six selected mechanical spare records was a significant correction to my assumptions. Sixty-two could be reconciled with the relevant current equipment, twenty-four were obsolete in that support arrangement and ten remained uncertain. The original total had described records held, not the range of maintenance situations the stock could credibly support.

In January 2013 I became operations director. The role connected production planning with the services required to sustain it. I learned to examine a proposed capacity investment alongside the sequence creating the apparent constraint. In 2016 we adopted authorised sequence changes and limited supporting modifications before treating a larger utility expansion as the only answer. CNY 5.2 million funded the correction. The selected planning-pressure measure improved between two defined observation periods, but a remaining requirement stayed in the investment discussion. The useful result was a better account of the decision, not an argument that capital spending was inherently undesirable.

I was appointed COO in September 2018. My current responsibility includes 1,850 operating and site-support colleagues, seven direct reports and CNY 1.08 billion delegated annual operating expense for 2026. Lanshivera’s CNY 5.6 billion company revenue for 2025 is a different measure. I report to fictional CEO Meilin Cen and work with independently led quality, regulatory, technical and safety functions. My role connects their authorised decisions to the operating plan; it does not replace their judgement because a production date has become difficult to meet.

The 2022 shutdown tested that boundary. Eighteen proposed packages had reached the planning list, but seven still had unresolved preparation conditions. After the relevant engineering and control assessments, we committed to eleven and kept the other seven in an explicitly owned programme. The eleven were completed. I did not include the deferred work in a claim that the original scope had been delivered, and I did not describe the operating decision as permission to waive a necessary maintenance requirement. The CNY 8.6 million additional expense belonged in the account alongside the narrower executable scope.

A later expansion showed me a related problem after the opening milestone. Twenty-seven of thirty-six maintenance responsibilities had an enduring arrangement; nine still relied on temporary support. We funded a transition and moved six of those nine to their agreed permanent arrangement, leaving three visible as unfinished. I now bring that ownership question into projects earlier. My future contribution would be to an institution willing to examine the support work behind its production promise. I also have a carefully bounded interest in a first board role, where I would contribute through questions about assumptions and accountability rather than attempt to manage a plant from the boardroom.

Portrait of Qingshu Guo
Qingshu GuoChief Operating Officer · China

In my own words

Maintenance does not become less necessary when the production calendar is full. I want the operating plan to show the support work, decisions and enduring responsibilities on which the plant depends. A machine installed, a part counted or an area opened is the beginning of a different question: what makes it usable, and who will sustain that condition?

Qingshu Guo

Career

Chapters of accountability

  1. September 2018 — present

    Chief Operating Officer

    Lanshivera Therapeutics

    I connect production commitments with maintenance readiness and keep unfinished support responsibilities visible after major milestones.

  2. January 2013 — August 2018

    Director of Operations

    Lanshivera Therapeutics

    I examined the operating sequence behind capacity proposals before treating a larger investment as the only answer.

  3. September 2006 — December 2012

    Head of Plant Services

    Lanshivera Therapeutics

    I replaced an inventory-led availability claim with a more precise account of the maintenance situations the stock could support.

  4. June 1999 — August 2006

    Maintenance Planning Manager

    Nanshivera Medicines

    I corrected a scorecard of my own design after supervisors showed that its consistent categories did not support useful decisions.

  5. July 1993 — May 1999

    Utilities Engineer

    Nanshivera Medicines

    I learned to connect equipment records, support conditions and authorised judgement while preparing maintenance work.

Education

Formation

  • Bachelor of mechanical engineeringQiravelle Institute1993

Working languagesMandarin · English