I work at the point where a manufacturer's long memory meets technology's shorter life. At Orvanel Therapeutics, the systems under my care support laboratories, manufacturing operations and the enterprise around them. An instrument may be replaced, an application may receive a new release and a supplier may end support, while colleagues still need to understand earlier work. My responsibility is to maintain the technical conditions for that understanding. I do not decide whether a medicine can be released or whether an investigation is satisfactory. Those decisions require the authority and expertise of our quality and operating colleagues.

Thirty-two years in this work have changed what I look for in a completion report. I want to know whether an authorised reader can retrieve the relevant record, identify the method and version, and examine the history needed to interpret it. A successful backup message answers a narrower question. So does a project milestone marked complete. I have supported delays and continuing costs when the proposed change would leave those questions unresolved. The difficult part is making the consequence precise enough that the decision can be challenged, rather than surrounding an uncertain proposal with the language of assurance.

I lead 144 technology employees through six direct reports, with forty-two contracted specialists counted separately. Our 2026 authority is EUR68 million: EUR44 million for continuing operations and EUR24 million for change. That is my executive scope within a 4,600-person business, not the size of an organisation I run as chief executive. I report to Lucien Mervaul, our CEO, and work closely with Celiane Vaumery, our quality director. Our different responsibilities are useful. They prevent a technical recommendation from becoming an unexamined substitute for the decision another function must own.

An exercise that changed our definition of restoration

Fourteen instrument-system exercises began with successful backup reports. Eleven restored the complete test package; three could not supply the method-version context required for interpretation. I supported a EUR1.4 million improvement programme and retained the original sources while quality colleagues assessed usability. The finding concerned controlled exercises, not a claim that production records had been lost.

A legacy reader kept for a stated reason

In a 1,200-package archive sample, 144 packages needed the older reader. I recommended retaining a segregated retrieval capability at EUR430,000 rather than immediately pursuing the proposed EUR180,000 annual decommissioning saving. The sample identified a dependency; it did not establish a failure rate for the entire archive or an indefinite retention requirement.

Review capacity included in the investment decision

I deferred a EUR4.2 million analytics proposal when the relevant specialists could not review it alongside the approved programme. Our EUR24 million change allocation still had a defined purpose and contingency. Additional money alone would not have created the experienced people or protected time needed to evaluate a further change responsibly.

Current focus

My present focus is continuity of record interpretation across instrument renewals and supplier releases. I want a programme sponsor to describe who will need the evidence later, which technical dependencies remain and how the proposed change will be examined. The answer should survive the departure of the project team.

Conversations I welcome

I am open to a carefully scoped non-executive conversation where technology, manufacturing and evidence stewardship meet. An external role would need employer agreement, a workable twenty-one-day annual commitment and a proper examination of conflicts and appointment requirements.

Chapter I

Preface

I began as a systems analyst at Cerlun Pharmaceuticals in September 1994, three months after completing my master's degree in information systems at Avelmont Institute. My first work concerned manufacturing records and the interfaces through which colleagues found information from earlier operations. I was one of eight analysts, without direct reports or budget authority. I learnt by sitting with people who knew what a record meant before asking how to move it. An unfamiliar field on a screen could be a minor presentation issue or the clue on which a later explanation depended. I could not determine which by examining the database alone.

Cerlun had 620 employees and EUR145 million revenue by the final period of that appointment. Those are the circumstances at the end of my time there, not its scale throughout the preceding years. I remained until March 2002, gaining responsibility for technical analysis without pretending that it gave me authority over the manufacturing decision. I was increasingly interested in the arrangements around systems: ownership, support, training and what happened when an exception did not fit the documented process. To work on those matters directly, I needed a role with people and operating responsibilities.

I joined Orvanel Therapeutics in April 2002 as plant informatics manager. The company then operated at a smaller scale than it does today; by the close of that role it employed 1,400 people and recorded EUR320 million revenue. I led twenty-four technology colleagues through four direct reports with EUR3.8 million annual authority. The work brought me closer to production schedules and the practical consequences of an unavailable application. I learnt to plan changes with the plant rather than deliver a completed technical schedule to it. A maintenance window was an operating agreement, and its assumptions deserved the same attention as the installation instructions.

In January 2009 I became head of laboratory systems. Forty-six people and EUR9.6 million annual authority sat within that remit. The laboratories made another distinction unavoidable: moving an output is not necessarily preserving the record from which that output was derived. Methods, versions and the history of changes could affect what a later reviewer understood. I worked with specialists to describe those dependencies before selecting a migration approach. I also learnt to resist borrowing their authority. Technology could make material available and maintain access controls; quality colleagues had to determine whether the evidence served the intended purpose.

My move to enterprise systems director in July 2014 widened the field to the relationships between laboratory, manufacturing and commercial applications. I led eighty-eight colleagues through five reports and managed EUR26 million annually. During that period the institutional investor acquired its 42% holding in 2016, leaving the family with 58%. That ownership change did not turn every technology decision into a board decision. It did require clearer accounts of investment, responsibility and the continuing costs left behind by a programme. I began to write proposals with the remaining dependency beside the expected benefit, so that a decision maker could see what completion would and would not settle.

I became CIO in January 2020. Today Orvanel employs 4,600 people, principally across its French and Belgian plants, its Lyon headquarters and a Netherlands distribution operation. Its 2025 revenue was EUR1.36 billion from established prescription medicines, principally oral solid doses. I lead 144 technology employees through six direct reports, supported by forty-two contractors counted separately. My EUR68 million authority for 2026 divides into EUR44 million operations and EUR24 million change. Lucien Mervaul is my executive reporting line. Celiane Vaumery and her quality organisation are essential counterparts, with responsibilities that remain distinct from mine.

Some of my most consequential decisions have been recommendations to preserve an apparently inconvenient dependency. We retained an older reader when sampled historical packages still required it. We held an electronic batch-record rollout when six rehearsal records lacked adequate reasons for changes, although their change history had been retained. We delayed a supplier release when controlled workflow scenarios exposed display mappings and permission boundaries that were not ready. Each choice had a cost. I consider it part of my account to state that cost alongside the reason, without claiming a patient outcome, a regulatory endorsement or an avoided loss that I cannot demonstrate.

I present technology matters to the board and its risk discussions, but I have never served as a director. That distinction matters as I consider a future external contribution. I could help directors question the relationship between technical evidence and an operating claim, while continuing to learn the financial and legal responsibilities of a seat. My proposed availability is twenty-one days a year, subject to consent and the actual demands of an appointment. I am interested in enterprises that value a durable explanation of their work, including the parts a new system has not yet made simpler.

Chapter II

A Philosophy of Leadership

A record should remain understandable after the people, software and instruments that produced it have changed.

Stefan Duvall

Chapter III

Areas of Practice

  1. IContinuity of regulated electronic records
  2. IILaboratory and manufacturing application change
  3. IIISupplier-release acceptance
  4. IVTechnology investment and review capacity

Chapter IV

Selected Work

§ 1

Fourteen successful backups, three incomplete restorations of context

In October 2024 we examined restoration capability for fourteen instrument-system test packages. Every relevant backup job had reported success. The programme team initially proposed using that result as evidence that the recovery arrangement was ready. Laboratory colleagues asked a more useful question: could an authorised reviewer understand the restored material with the method version and associated context intact? Eleven packages met the agreed exercise criteria. Three did not supply the necessary method-version context through the restored environment. These were controlled exercises, not reports that production records had been destroyed or that medicines had been affected.

The immediate choice was between closing the exercise on the strength of the backup reports or continuing the work with a narrower account of what had been demonstrated. I recommended the latter. I asked the team to preserve the original sources and document precisely what the three exercises could not reproduce. Quality colleagues retained responsibility for assessing suitability and the further examination required. My responsibility was to provide a technical route, its dependencies and a realistic cost. We agreed a EUR1.4 million capability programme over twelve weeks, including the relevant configuration context and repeat exercises.

That programme cost more than the original completion recommendation implied, and it consumed specialist time already requested elsewhere. I took both consequences to the investment discussion. I also refused to describe the eleven passing packages as evidence about every instrument system. They established a result for those exercises and their agreed conditions. Broader coverage needed its own selection and review.

By the end of the twelve-week work, the three packages could be read with the required method context in the exercise environment, and quality colleagues reviewed that evidence. We retained the exercise record and the original limitation in the programme account. I do not present that as a universal recovery assurance or a regulatory certification. The useful change was that our readiness discussion now distinguished a completed backup job from a demonstrated ability to interpret the recovered material. That distinction has continued to shape the questions I ask before supporting a closure recommendation.

I would ask record users to define a meaningful restoration before the first backup exercise, including the context they need to interpret recovered material without reconstructing its history.

§ 2

An eight-week pause for reasons that had not been captured

Our March 2025 electronic batch-record rehearsal covered thirty representative test records before a wider rollout. Twenty-four retained the expected change history and adequate recorded reasons. Six retained the sequence of changes but did not capture sufficient reasons through the proposed workflow. The data had not simply vanished; the weakness was in the explanation available to a later reviewer. Quality colleagues identified the significance of that distinction. I could describe the application behaviour, but I could not decide that the missing explanations were immaterial.

The release calendar created pressure to treat the six as training matters that could be resolved after introduction. I recommended holding the rollout. The alternative would have placed the burden on users and reviewers while leaving the capture mechanism unchanged. We accepted eight additional weeks on the existing arrangement at EUR620,000, including continued support and the planned transition team's extended work. That amount was an actual cost of our chosen delay, not a theoretical loss avoided or a claim about the value of a product batch.

I assigned the technology team to correct the workflow and make its behaviour observable in further rehearsal. Celiane Vaumery's quality organisation determined the examination and acceptance needed for the records and process. We kept the deficient rehearsal examples available. Nobody was asked to invent a plausible explanation for an earlier change simply to make the evidence look complete. Where further clarification was possible, its source and timing needed to remain distinguishable from the original entry.

The subsequent rehearsal supplied adequate reasons through the corrected route against the agreed scenarios, enabling the relevant owners to consider the rollout again. That did not prove that every future user would always make a sufficient entry. Training, oversight and investigation remained continuing responsibilities. My account to directors therefore included the delay, its cost and the remaining operating dependence. I regard this as an example of technology leadership because I took responsibility for a technical weakness without absorbing the quality decision or converting a successful rehearsal into a broader assurance than it could support.

Looking back, I would examine how reasons for changes are captured during initial workflow design, before a later review reveals that a technically complete record cannot explain itself.

§ 3

A supplier release held at eighteen failed workflow scenarios

A planned laboratory application release in September 2025 arrived with a supplier schedule that favoured a prompt move to the new version. Before accepting that schedule, our laboratory, technology and quality colleagues agreed 180 workflow scenarios for the configured environment. Tests used controlled copies. Of those scenarios, 162 passed and eighteen failed: eleven showed mapping-display discrepancies and seven exposed permission boundaries that did not match the agreed use. There was no claim that an actual product decision or patient had been affected by these tests.

The supplier offered to proceed with temporary instructions for users while corrections followed. That approach would have transferred part of the burden from a known technical issue to the people conducting and reviewing work. I recommended a six-week deferral and continued support for the current version. Parallel support cost EUR780,000 over that period. I took the cost to the executive discussion rather than describe it as a supplier problem with no consequence for our own budget.

We divided the unresolved work by the decision it required. Technology colleagues reproduced and documented the behaviour; laboratory specialists explained the intended use; quality colleagues determined the evidence needed for acceptance. The eleven display discrepancies and seven permission failures remained separately visible. A correction to the first group could not be used to close the second. I also asked that the 162 passing results stay attached to their scenarios and test conditions, rather than become a general percentage of application safety.

Following the corrections, the eighteen scenarios were repeated, and the relevant surrounding checks were examined before the responsible owners agreed the next release step. The report preserved the original failures and the cost of the changed schedule. We did not infer universal suitability from that exercise or claim a measurable improvement in medicine quality. The decision's value was more specific: the business did not have to accept a supplier timetable as a substitute for its own evidence about the configured environment. I learnt again that commercial support pressure belongs in the decision, but should not quietly determine the acceptance standard.

I would agree the configured workflow scenarios before the supplier’s release window approaches, preserving time to examine failures without the renewal calendar dominating the discussion.

§ 4

Keeping the old reader after an archive sample challenged retirement

In January 2026 a decommissioning proposal included an estimated EUR180,000 annual saving from retiring an older laboratory reader and its support. Before approving it, we examined 1,200 sampled historical packages. A total of 1,056 were fully readable through the proposed replacement route; 144 required the older reader to supply the needed interpretation. The sample was selected to explore different periods and configurations. It was not a statistically representative estimate of the whole archive, and I did not multiply its result into a company-wide failure count.

The immediate choice was whether to retire the older capability on schedule or retain a controlled means of retrieval while developing a better-supported route. I recommended a segregated reader and support arrangement costing EUR430,000 for the defined retention programme. The proposal included access restrictions, named support ownership and periodic retrieval exercises. It was more expensive than the first retirement paper, and it postponed the stated annual saving. That cost was visible to finance and the programme sponsor before the decision.

We kept the original packages unchanged while examining the dependencies behind the 144 cases. Laboratory and quality colleagues determined what material was needed for the intended review. Technology colleagues maintained the ability to retrieve it and documented the reader, configuration and access arrangements. We did not assign an arbitrary universal retention period or argue that an old application should remain indefinitely merely because it had once been useful. The continuing need and the route to eventual retirement required further evidence.

At the review point the 144 sampled packages could still be examined through the retained capability, while work on a replacement interpretation route continued. That was a bounded operating result, not proof that every archived package was covered or that the arrangement met every possible future requirement. I used the case to change the way we discussed retirement: a system can stop accepting new work before the organisation can stop depending on it. A proposal needs to identify which of those events its savings assume, and who has the authority to confirm that the dependency has ended.

I would test representative archived material before including reader retirement in the savings proposal, making continuing interpretation requirements part of the original economic choice.

§ 5

Deferring analytics when the missing resource was experienced review

When setting the 2026 technology programme, I had EUR24 million of change authority within the wider EUR68 million technology budget. The agreed allocation was EUR7 million for instrument-record stewardship, EUR9 million for enterprise renewal, EUR5 million for access and continuity, and EUR3 million contingency. A separate EUR4.2 million analytics proposal had an attractive account of how operating colleagues might examine manufacturing information. Its sponsors asked whether additional funding could bring it into the same delivery year.

I asked the team to identify the experienced laboratory, manufacturing and quality colleagues whose participation the proposal required. Their review was not an interchangeable service that could be purchased at the last moment. They already had continuing duties and commitments to the approved programme. The proposed analytics timetable assumed their availability without obtaining it. External technical capacity could help build the application, but could not replace all the internal knowledge or acceptance responsibilities on which the plan depended.

I recommended deferral rather than adding a funded project with an unsupported review schedule. Lucien Mervaul and the operating sponsors challenged the recommendation, appropriately asking whether a smaller initial scope could proceed. We examined that option. The narrowed proposal still depended on the same scarce reviewers at the same time, so it did not resolve the constraint. I preserved the analytics proposition for a later planning decision and asked the sponsors to prepare an explicit capacity requirement instead of treating the delay as a judgement that the idea had no value.

The EUR24 million allocation remained unchanged, including its EUR3 million contingency. We did not call the EUR4.2 million deferred request a realised saving, because it had not been approved expenditure. Nor did we claim that deferral improved product quality or accelerated the other programmes without evidence. The outcome was an investment schedule with fewer unowned assumptions. For me, the leadership test was to describe a constraint that money alone could not immediately remove, while accepting the opportunity cost of postponing a potentially useful capability and leaving a clear basis on which the decision could be revisited.

I would map experienced reviewer capacity before inviting competing analytics proposals, so scarce operating judgement enters the investment sequence before each programme acquires a promised start date.

Chapter V

Essays

An invitation

Contact

I am open to a carefully scoped non-executive conversation where technology, manufacturing and evidence stewardship meet. An external role would need employer agreement, a workable twenty-one-day annual commitment and a proper examination of conflicts and appointment requirements.

Open to
  • Board appointments
  • Speaking invitations
  • Executive opportunities

office@stefanduvall.example