In 2023 a gap between major assignments affected 38 experienced employees. The pipeline supported several possible uses for their capability, but the dates were not firm enough to promise every person a particular project. An immediate reduction would lower expense; retaining the group would preserve experience at a known cost. I supported a five-month capability pool only after we described the work to be done during the interval and the point at which the decision would be revisited.
The arrangement cost SGD 1.12 million. It included defined internal assignments, peer support and preparation for likely operating needs, rather than treating employees as available without a meaningful role. Finance challenged the uncertainty in the pipeline. I agreed that the proposal should not present prospective work as committed revenue, and we recorded the alternatives if the expected assignments did not materialise. Employees received the same distinction between a possibility and a confirmed posting.
At the end of the period, 24 colleagues moved into new project roles, nine into asset operations and five left by agreement. Those outcomes reconcile the original 38-person population. Individual arrangements were handled through appropriate employment processes and advice. The account does not claim that every transition matched the employee’s first preference, or that the retention expense was recovered through a measurable project saving.
The decision bought time and preserved options, with a cost management could examine. It was not a standing promise that every future project gap would be funded in the same way. I would consider the capability, pipeline, available work and financial position afresh. The useful discipline was to avoid two misleading extremes: describing all retained capacity as waste, or treating experience as so valuable that its cost no longer required explanation. The organisation made a bounded investment and followed the employment account to a definite outcome.