Confidential mandate

High-Bandwidth-Memory Package Qualification Director — AI Systems

Planned Hiring / New

High-Bandwidth-Memory Package Qualification Director mandate in Tel Aviv, Israel · AI Systems Hardware

A Tel Aviv AI-systems designer needs a specialist director to qualify HBM stack integration, thermo-mechanical life and repair boundaries through an accepted five-month hardware programme.

The mandate

A new AI module couples multiple high-bandwidth-memory stacks to a large logic die through a silicon interposer, but qualification evidence fragments at supplier boundaries. Thermal cycling shows intermittent lane repair and stack-to-interposer resistance shifts, while system workloads create gradients not represented by component stress. The defined problem is to establish lifetime and manufacturing evidence for the integrated memory subsystem without confusing redundancy with absence of degradation.

The deliverables are a memory-subsystem failure model, configuration genealogy, assembly and reflow limits, warpage and thermal correlation, lane-repair interpretation, stress matrix, system-workload translation, supplier deviation process and qualification dossier. Evidence must bind stack revision, interposer, attach, substrate, thermal solution and firmware repair state. The design must define when a repaired lane indicates tolerable margin consumption versus progressive physical damage.

Four milestones govern five months: configuration and failure-hypothesis baseline by 30 October 2026; representative thermal-mechanical and electrical stress design by 11 December; completed supplier and system demonstrations by 29 January 2027; and accepted lifetime case, production limits and client-team rerun by 26 February. Each milestone includes declared sample genealogy and unfiltered repair telemetry from tested units.

Acceptance requires package engineering to reproduce physical correlations, memory teams to explain lane behaviour, system reliability to validate workload translation and quality to decide each open supplier deviation. The sponsor returns one consolidated variance register within six working days. Nominal bandwidth after repair cannot close a finding when cumulative spare use, interface margin or thermal distribution remains unexplained.

The client provides design and package models, assembly records, HBM telemetry, stress chambers, thermal maps, system workloads, failure-analysis access, supplier contacts and production-representative modules. It funds agreed sample builds and protects destructive-analysis material. The director cannot release product, alter supplier contracts, change customer workload guarantees or determine warranty action; authorised client leaders execute those decisions.

Why this is external work

Memory, interposer, package and system teams each own valid evidence at a different boundary, but no supplier is accountable for the complete installed stack. Schedule pressure also rewards passing performance after repair rather than understanding consumed margin. An external qualification director can reconcile the full mechanism and exit when the client accepts explicit lifetime and production limits.

What you will own

  • Build end-to-end genealogy for memory stacks, interposer, micro-bumps, substrate, attach, reflow, thermal solution and firmware state.
  • Model thermo-mechanical stress across stack height, die mismatch, package bow, board constraint, cooling pressure and workload gradients.
  • Interpret lane repair, error counters, bandwidth variation and interface margin as possible physical degradation evidence.
  • Design accelerated tests that preserve relevant interconnect, dielectric, thermal-interface and package-fatigue mechanisms.
  • Reconcile supplier component qualification with integrated reflow, cooling, board and system operating conditions.
  • Establish manufacturing and field triggers for containment, additional screening, deviation, workload limitation or design correction.
  • Deliver the accepted qualification case, sample record, residual risks, production controls and client-led review rehearsal.

Candidate qualifications

  • Directed HBM, 2.5D or advanced-package qualification for high-performance compute, networking or graphics systems.
  • Can evidence a stack or interposer degradation hidden initially by redundancy, repair or nominal system throughput.
  • Understands micro-bumps, interposers, warpage, thermal gradients, repair telemetry, signal margin and accelerated reliability.
  • Has challenged memory, foundry, OSAT and system teams while respecting proprietary evidence boundaries.
  • Designed system-representative stress where component qualification omitted workload-driven thermal or power interaction.
  • Converts complex package evidence into bounded production, supplier and field-action decisions executives can accept.

Non-negotiables

  • Will attend all Tel Aviv, Seoul and Taipei laboratory and supplier sessions in the milestone calendar.
  • Has personally qualified production HBM or comparable stacked-memory integration with physical post-stress evidence.
  • Accepts milestone rejection if repair telemetry or sample genealogy is incomplete for the claimed configuration.
  • Will disclose memory, foundry, OSAT, cooling and AI-hardware customer relationships before engagement.
  1. 49 words maximum. Which HBM degradation signal remained hidden longest behind lane repair or redundancy?
  2. 49 words maximum. How would you translate an AI workload into a representative package reliability stress?
  3. 49 words maximum. What evidence should bound a supplier deviation for an integrated memory stack?

This mandate is confidential. The client is named only under a mutual NDA, and your own record is never listed, sold or shown to a company under your name until you release it for this specific mandate.