Skip to website
Shalini VekrashiChief Information Officer

Executive summary / Personal profile

The same number described two different pieces of equipment

Portrait of Shalini Vekrashi

Chief Information Officer India

I want a cargo operation to recognise its equipment, reconcile interrupted work and leave a technology supplier without losing the system it thought it owned.

Open to Board appointments · Executive opportunities

Start a conversation

01 / Leadership approach

A system earns trust when its meaning survives a handover. The next person should know which physical item the record describes, which event has already happened and which capability still depends on somebody outside the enterprise.

02 / Areas of responsibility

  • Equipment identity across different numbering systems
  • Reconciliation after disconnected operating work
  • Supplier-exit rehearsals beyond a data export
  • Technology authority beside qualified operating decisions
Information function
23 colleagues
Three leads across enterprise systems and operating support
Annual IT expense
₹4.9 crore
Separate ₹2.6 crore change programme; operating suitability separately owned
Systems career
32 years
Applications support through enterprise information leadership

Evidence from practice

The import that made six pairs look like six devices
In 2018 we combined equipment records that had been maintained in separate local contexts.
Eight late uploads were eight earlier handovers
The selected 2023 exercise contained 32 operating handover events.
The exported files did not contain two working functions
In 2025 we rehearsed a proposed supplier exit against twelve agreed business functions in a replacement environment.
The complete case record ↗

The same number described two different pieces of equipment

A battery and a charger could carry the same local number. In 2018 I approved an import that treated the number alone as an enterprise identity. Our selected review found 24 physical devices represented by 18 records: six numbers had each been used for two different devices. The application had made the register look tidier by collapsing distinctions the workshop still needed. I had accepted the premise behind that result.

I am Shalini Vekrashi, chief information officer of Derlashi Urban Cargo in Surat. Our 184 colleagues provide electric cargo-cycle operations and fleet support, with ₹91 crore FY 2025–26 revenue. Three leads coordinate my 23-person IT function. Ajay retains enterprise authority and Roshan owns operations. My team can repair the way a system identifies equipment; it cannot infer technical suitability or authorise use merely because a record has become unique.

Later work tested whether the account survived other kinds of handover. A selected exercise contained 32 operating handover events: 24 recorded online and eight recorded during disconnection, then reconciled without presenting their later upload as new physical activity. A supplier-exit rehearsal found that ten of twelve agreed business functions ran in the replacement environment while two still depended on supplier components. I kept those dependencies visible rather than describe an export as completed independence. These are bounded fictional examples, not universal performance claims. My career began in applications support, and I remain interested in the moment a technically convenient representation acquires an operating meaning it cannot justify. A first outside-board contribution would require further preparation, employer consent and a specific assessment, with 23 proposed annual days. I would bring a willingness to ask what the enterprise can actually identify, reconcile and operate when the familiar context is no longer available.

Twenty-four devices needed twenty-four distinct identities

Six shared local numbers had collapsed twelve physical devices into six records within an eighteen-record import; the selected register was rebuilt without treating identity as technical approval.

An upload was not another physical handover

Eight disconnected events were reconciled with 24 online events in a selected 32-event exercise; the connection returning did not create new operating work.

Two supplier dependencies remained after export

Ten of twelve agreed business functions ran in the replacement environment at the first rehearsal; two required further work before the tested scope could be accepted.

A defined information-function remit

Three leads coordinate 23 colleagues within ₹4.9 crore annual expense and a separate ₹2.6 crore change programme; operating suitability remains with qualified owners.

Current focus

Enterprise systems that preserve identity, unfinished events and supplier dependencies

Conversations I welcome

A continuing CIO mandate and preparation for one suitable outside appointment

The leadership record

Trusted with consequential decisions.

In the boardroom

  • Derlashi Urban CargoExecutive technology presenter; no statutory appointment · April 2021–present

Formation

  • Bachelor of Science in ComputingKelnavri Computing College · 1994
Shalini made the supplier rehearsal useful by naming the two functions we still could not run, rather than allowing a successful export to settle the business question.
Ajay DervalkiFictional Chief Executive, Derlashi Urban Cargo
The full record ↗

Contact

A continuing CIO mandate and preparation for one suitable outside appointment

  • Board appointments
  • Executive opportunities