The arithmetic was exact; my description was wrong

Portrait of Jaswant Rehqavri

Chief Data Officer · India · Volume I · 2026

The arithmetic was exact; my description was wrong

I approved an average that was arithmetically correct for two contract prices and wrong for the pooled-volume question we claimed to answer. One fictional contract covered 1 MWh at ₹4,000 per MWh; the other covered 9 MWh at ₹6,000. Their equal-contract mean was ₹5,000, but their combined ₹58,000 expenditure across 10 MWh gave ₹5,800 per MWh. I had allowed the convenience of a simple mean to decide the meaning of the published figure.

I am Jaswant Rehqavri, the fictional CDO of Qezramthi Energy Studies in Patiala. We publish regional industrial-energy research; we do not generate, trade or sell electricity. Thirty-one data colleagues work through four leads, with five external research specialists separately counted. My ₹6.2 crore function expense is distinct from the 145-person enterprise's ₹82 crore FY2026 revenue. Qualified methodology, licensing and commercial owners retain their responsibilities, and our readers make their own procurement decisions.

Nitin's challenge required a correction to the research account, with ₹43 lakh review and publication expenditure retained. The contracts shared the study period and an energy-only price basis. Neither average represented an all-in customer bill or an actual market recommendation. I keep the example because it exposes a mistake in my own interpretation, not because volume weighting is automatically the right answer to every price question. The intended unit and purpose have to be established first.

A revised series kept its earlier release

Seven of twenty-four monthly observations changed during revision. We preserved first-release and latest values with dated explanations instead of silently replacing the account a reader had originally received.

The respondent panel did not become the whole country

A 120-respondent panel contained 84 urban-industrial and 36 other respondents. The published scope was narrowed to that panel while further design work examined the coverage needed for a broader claim.

A category change remained separate from physical change

A classification review left 51 of 60 respondents with supported new-category mapping and 9 unresolved. The unresolved records remained visible without being forced into comparisons their attribution could not support.

Current focus

I am improving the traceability of our research conclusions through weights, release histories, respondent coverage, permitted data use and classification changes.

Conversations I welcome

Research-data discussions and a potential first outside contribution after preparation, capacity and relationship review.

Chapter I

Preface

I grew up in Amritsar and became interested in the distance between a number and the question somebody believes it answers. Statistics offered a disciplined way to examine that distance, although a formal qualification did not prevent me from making a later interpretive mistake. I completed a statistics degree in May 1995 and a master's in applied statistics in June 1997 at the fictional Dezqerthi Institute of Statistics. My first employment began in July 1997. The twenty-nine years since then have involved the evidence and definitions behind research used by business readers.

At Raqzavthi Research Services I began as an analyst in a forty-five-person enterprise with ₹12 crore FY1998 revenue. I had no delegated budget or direct reports. Under a research manager, I assembled records and learned to preserve the context of a comparison. A field could contain a clean number while its unit, period or population remained uncertain. My contribution was supervised analytical work, not authority over the client's business. I learned that the question should determine which calculation is useful, rather than allowing an available column to decide what the report appears to know.

Promotion to research-data manager in June 2002 brought eight colleagues and ₹78 lakh annual function expense. The employer had eighty employees and ₹26 crore FY2003 revenue. I became responsible for the consistency of an account assembled by several people, including the definitions that accompanied extracts as they moved into analysis. The work required attention to what later readers might infer from a short label. It also taught me to distinguish a data team's responsibility for a reproducible account from a research specialist's responsibility for the method and a client's responsibility for the decision made with it.

I moved to Qezramthi in September 2010 as head of series data. The regional industrial-energy publisher had ninety-five employees and ₹38 crore FY2011 revenue. My fifteen-person function carried ₹2.5 crore annual expense. Research publication made release history more consequential: a reader might have relied on one version while a later study contained revised values. I wanted those histories to remain recoverable. That interest developed alongside responsibility for respondent definitions and source relationships, without suggesting that the company was an official statistical authority or that its selected research population described every industrial user in India.

The January 2016 appointment as director of research data was a functional role, with no statutory seat. I led twenty-three colleagues and ₹4.4 crore annual expenditure in a business then employing 118 people with ₹59 crore FY2017 revenue. In 2018 I approved a figure described as the average cost across a pooled electricity volume. It was actually the equal mean of two contract prices. Nitin asked me to follow the quantities behind the rates. The records were accurately copied; the interpretation I had approved still answered a different question from the one our label promised.

The fictional contracts covered 1 MWh at ₹4,000 per MWh and 9 MWh at ₹6,000. Their combined energy-only expenditure was ₹58,000 for 10 MWh, giving ₹5,800 per MWh. The ₹5,000 equal-contract mean remained valid for its own narrower definition, but not as the claimed pooled-volume result. The review and correction cost ₹43 lakh. We retained the contract-level figures, the common period and the stated price basis. I did not turn the difference into a customer loss or claim that a corrected research figure changed anybody's actual bill. The mistake belonged in my account because I had approved its meaning.

I became CDO in May 2021. Today I report to Salma and lead thirty-one employees through four leads, with five external research specialists counted separately. My annual function expense is ₹6.2 crore. The employer's ₹82 crore FY2026 revenue combines ₹61 crore subscriptions and ₹21 crore commissioned research. It is a 145-person publisher, not a generator, retailer or trader. Founders, an employee-management trust and an institutional investor hold 48%, 32% and 20% respectively; I have no personal holding or statutory appointment. Those facts define the enterprise and my role without establishing independence for another company's board.

The later cases examine how a research conclusion changes as its supporting account travels. We preserved original and revised monthly releases, narrowed a panel's geographic claim, retained licensing limits in an external data product and reconstructed classifications before comparing a series across a changed taxonomy. Each response made the publication less simple in some respect. Each also retained expense and unfinished work. Data stewardship did not create more electricity, establish a procurement recommendation or decide a legal interpretation simply because a dataset could be reproduced. Appropriate research and professional owners continued to make those judgements.

I work in English, Punjabi and Hindi. Registration and assessment preparation for a possible outside appointment remain unfinished; neither an assessment pass nor an exemption is claimed. A provisional twenty-two-day allowance would need to fit current employment and a specific board's demands. I would first learn what conclusions the enterprise needs its data to support and where those conclusions become consequential. My intended contribution is to make the evidence and interpretation discussable, including the assumptions I have personally approved, while respecting the specialist decisions a data executive cannot settle alone.

Chapter II

A Philosophy of Leadership

I want a reader to recover the question a number answers. That requires more than retaining a source file. The account must preserve the population, the weighting, the version available at the time and the classification applied. My own averaging mistake showed that accurately copied prices can become a misleading summary when the unit of the intended question disappears.

Jaswant Rehqavri

Chapter III

Areas of Practice

  1. IThe question behind a weighted summary
  2. IIResearch releases with recoverable histories
  3. IIICoverage and classification in comparative evidence
  4. IVPermitted use within the data product

Chapter IV

Selected Work

§ 1

I published the answer to a different averaging question

In 2018 I approved a research summary describing the average energy-only price across a combined purchased volume. The underlying fictional contracts covered one MWh at ₹4,000 per MWh and nine MWh at ₹6,000. We copied both rates accurately, then used their equal-contract mean of ₹5,000. The label implied a pooled-volume result. My approval allowed an exact calculation to support a claim that the calculation did not answer. The contracts shared the same study period and price basis; this was not a comparison of unrelated bills.

Nitin challenged me to follow the quantities as well as the rates. One contract accounted for ₹4,000 and the other for ₹54,000. Their combined ₹58,000 across ten MWh gave ₹5,800 per MWh. An editor argued that the equal mean was simpler to explain and that changing it could suggest the source prices themselves were wrong. That concern helped identify what the correction needed to say. The original arithmetic remained valid for an equal-contract question. We had misdescribed its purpose, and I needed to own that distinction rather than replace one unexplained figure with another.

I authorised a review of the summary's interpretation and its publication treatment, working with the methodology and editorial owners. The correction retained the two rates, quantities, common period and stated energy-only scope. We explained both possible questions and identified which one the published label had promised to answer. Review and correction expenditure was ₹43 lakh. We did not equate the ₹800 difference between the two averages with a customer loss, an actual change in bills or a return from the review. No real tariff or purchasing recommendation was involved.

The episode changed what I required before approving a concise research figure. The intended population and unit now had to accompany the proposed calculation in the decision account. That did not make volume weighting the preferred method for every future study. An equal-contract average can be appropriate when the question genuinely concerns contracts with equal influence. My failure was allowing convenience to select the question without saying so. A useful correction restored that choice to qualified research discussion and made my own approval part of the published explanation.

§ 2

Seven revised observations did not erase the first release

In 2022 our current series contained revisions to seven of twenty-four monthly observations. Seventeen remained unchanged. The product team wanted a single clean download containing the latest values. That would make the current research easier to use, but a subscriber returning to an earlier publication could no longer establish what had been available when that publication was issued. The problem concerned the history of the research account, not a claim that every earlier observation was careless or that every revision improved a forecast.

I proposed retaining identifiable first-release and latest series with dated revision explanations. A product colleague objected that several versions could confuse readers and increase support work. That was a reasonable concern: a folder of unexplained extracts would preserve files without making their relationship understandable. We therefore needed a release structure that distinguished the recommended current account from the historical one, including which seven observations changed and the reason recorded for each change. The seventeen unchanged observations remained part of the same twenty-four-month comparison.

The programme carried ₹61 lakh expenditure for versioning and release work. Research owners assessed the reasons and implications of revisions; my team preserved their decisions in the release account. Readers could obtain the current series while also recovering the first release under its date. We avoided presenting today's corrected values as though an earlier reader had possessed them. We also avoided treating the retained history as a licence to continue distributing a known error without explanation. Both the correction and the sequence of publication needed to be intelligible.

The resulting product offered a more defensible account of what changed and when. It did not demonstrate forecast skill, quantify a trading opportunity or validate decisions made by subscribers. Those claims would require separate methods and evidence. Nor did retaining a version settle whether a particular revision reflected better coverage, a changed definition or an error; its explanation still mattered. The lesson for my role was practical: the current value and the value previously communicated are different research facts. A publisher should help readers distinguish them without requiring access to an employee's private archive.

§ 3

A useful respondent panel could not speak for all industrial India

In 2023 a research paper used responses from 120 industrial participants. Eighty-four were urban-industrial respondents and thirty-six belonged to the remaining defined panel categories. The draft introduction described the result in language that could be read as a national industrial estimate. The panel had not been recruited from a representative national frame. Complete responses and a clear spreadsheet did not resolve that limitation. I raised the issue before the wider claim became the basis of a subscriber-facing account.

The commissioning sponsor argued that the respondents were experienced and that a narrower description would reduce the paper's commercial appeal. Their experience did make the responses useful for questions about the participating group. It did not establish how the panel related to industrial users outside it. I asked the research team to identify the population the study could actually describe, the recruitment route and the coverage absent from that route. Applying convenient weights to the existing respondents would not, by itself, supply the missing design or prove that unobserved groups behaved similarly.

We narrowed the publication to an account of the defined panel and retained the composition alongside its findings. A ₹47 lakh programme examined recruitment design and the evidence a broader future study would require. This was research and design expenditure, not a claim that the original 120 had become representative. We did not invent an enlarged sample or report a revised national estimate. Methodology colleagues retained responsibility for design choices, while the commissioning and commercial owners had to explain the narrower product honestly to its intended readers.

The immediate consequence was less expansive language and further work before any broader claim could be considered. The panel remained valuable within its stated scope, including the questions its participants could illuminate. I did not want an audit of limitations to imply that all selected-panel research was useless. The leadership decision was to align the promise with the evidence we actually held. A reader should be able to see whose experience informs the account and whose experience remains outside it, instead of discovering that distinction only after attempting to apply the conclusion elsewhere.

§ 4

Four feeds supported the proposed external use; access to eighteen did not

In 2024 an external research package was being assembled from eighteen licensed data feeds. The delivery schedule assumed that technical access made each feed available for the package. Our review found twelve limited to internal analysis, four permitting defined redistribution and two whose proposed use still required interpretation. Those were different permission states. A functioning import process could not convert them into one unrestricted product, and a derived chart did not automatically settle the rights attaching to its underlying material.

The product sponsor argued that customers would receive analysis rather than raw files and that withholding material would weaken the launch. I understood the product concern, but the actual terms required qualified legal and licensing review. I would not offer my own general legal ruling about what every derived output allowed. The task was to describe the intended use precisely enough for the appropriate owners and licensors to assess it. We needed to distinguish internal research, redistribution and unresolved interpretation instead of treating a broad product label as permission.

The review cost ₹58 lakh. The external package used the four feeds within their verified scope. The twelve internal-analysis feeds retained their restrictions, and the two unresolved feeds were withheld from the proposed external use while interpretation continued. My team connected the source conditions to the package components and release decisions. Legal and licensing owners retained authority over interpretation; commercial colleagues retained responsibility for explaining the resulting offer. We did not describe the excluded material as unusable for every purpose, because the review concerned particular conditions and uses.

The package therefore had a narrower supported source base than the initial schedule assumed. I did not turn the decision into a quantified avoided fine or assert that a legal dispute had been prevented. Neither outcome was established. The useful result was a release account that matched the permissions actually reviewed and left unresolved questions open. Data leadership contributed by making those conditions travel with the product design. It could not replace the contracts or the people qualified to interpret them, even where a broader dataset would have made the launch more attractive.

§ 5

Reclassifying a respondent did not change the energy it used

In 2025 a research comparison moved to a revised industrial classification. Of sixty respondent firms, forty-four retained stable categories, ten involved categories that had split and six had ambiguous attribution. A simple conversion would have forced all sixty into the new labels and produced apparently complete comparisons. Yet a changed category could alter the reported distribution without any physical change in industrial activity. We needed to separate what the new classification described from what the firms had actually done.

The publication team wanted continuity in the familiar chart series. Leaving unresolved cases visible would complicate the presentation and reduce the set supporting some new-category comparisons. I regarded continuity as a valid reader need, but not a reason to invent attribution. We examined the supporting descriptions for the ten split-category cases and retained the six ambiguous ones for further work. The question was whether evidence supported a mapping under the new definitions, rather than which destination would make the historical chart look most stable.

The reconstruction programme cost ₹73 lakh. Seven of the ten split cases gained supported mappings; three remained unresolved. Together with the forty-four stable cases, that produced fifty-one supported mappings and nine unresolved records, including the original six ambiguous cases. We retained the old and new labels with their dates and mapping basis. Unresolved firms were not deleted from the research archive. They were excluded only from comparisons that depended on a supported new-category attribution, with the resulting scope made explicit to the reader.

The outcome was a comparison with a visible boundary, not a complete conversion of every respondent. Methodology owners still had to assess whether a particular longitudinal interpretation was appropriate. We reported no reduction in consumption, emissions or expenditure from changing labels, because classification itself established none of those physical or financial outcomes. The case reinforced a responsibility that sits between data processing and executive communication: when a series appears to move, the account should say whether the movement reflects observed activity, changed definitions or an unresolved combination. A tidy category field is useful only if its meaning survives the comparison it is asked to support.

Chapter V

Essays

An invitation

Contact

Research-data discussions and a potential first outside contribution after preparation, capacity and relationship review.

Open to
  • Board appointments
  • Advisory roles
  • Speaking invitations