Skip to website

Leadership & perspective

Chief Product Officer · India

2026-06-19 edition

Esther Qezvarli

A room that can change needs products that survive the change. I build learning-interior propositions around the next assembly, repair and owner, not only the opening photograph.

Leading article

A product should remain useful after the room changes

I grew up in Aizawl and studied design at the fictional Qevzamtri Institute of Design. My full-time degree ended in May 1997, and I joined Qevraltmi Interior Products in July. The regional enterprise employed thirty-six people and recorded ₹6 crore FY1998 revenue. I worked as a junior product designer under a studio manager, without a team or delegated budget. I enjoyed the clarity of a completed object, but the workshop introduced another account: people had to assemble it, move it and identify its parts long after the drawing had been approved.

In June 2003 I became a product coordinator. Qevraltmi then employed sixty-two people and recorded ₹15 crore FY2004 revenue. I led four colleagues under the product director, with ₹38 lakh annual function expense. The work brought design, production and client requirements into the same conversation. A detail that looked minor on a drawing could create repeated effort for someone installing or maintaining the product. I began to understand product coordination as a way of exposing those consequences before they became an unexplained burden on another team.

I joined Vazqelmi in September 2009 as product development manager. The practice employed ninety-two people and recorded ₹27 crore FY2010 revenue. I led seven colleagues with ₹91 lakh annual expense, reporting to the development director. The focus was learning interiors: tables, writing surfaces and storage elements for adult-training and workplace-learning rooms. These were not fixed exhibits. Clients wanted rooms that could respond to different programmes and move with their organisations. That expectation made the later life of a product part of its initial proposition, even when the first installation remained the easiest moment to photograph.

The January 2016 product director appointment gave me twelve colleagues and ₹2.1 crore annual expense within a 119-person practice recording ₹41 crore FY2017 revenue. In 2018 I approved a modular-table offer after a successful first assembly demonstration. Mary's challenge was to include dismantling, packing and reassembly. In the selected thirty-module exercise, eighteen retained all required fittings and twelve needed missing items replaced. I accepted that the original demonstration did not support the whole promise and committed ₹24 lakh to revise the relocation kit and instructions. The correction belonged to the product brief, not merely to a warning that the next team should be more careful.

I became CPO in May 2021. Vazqelmi now employs 146 people and records ₹54 crore FY2026 revenue, with ₹38 crore initial fit-outs and ₹16 crore renewal and parts services. My nineteen product colleagues work through three leads. The ₹3.4 crore FY2026–27 function expense is separate from a ₹1.5 crore prototype programme. Founder interests hold 39%, an employee vehicle 41% and a private investor 20%; I hold no personal shares. Arun Tevqazli is the CEO, and Mary Qezvomri leads design coordination. Their responsibilities remain distinct from mine and from the qualified assessments required for an actual installation.

My recent cases examine continuity rather than launch novelty. A worn writing surface can raise a different question from a damaged frame. A new version can share a family name while needing another adaptation route. A module moved to another room can become difficult to identify if its label only describes the old location. A long support promise can exceed the supply arrangements behind it. Each choice asks whether the product still makes sense to the person who encounters it after the initial buyer and project team have moved on.

I live in Imphal and work in English, Mizo and Hindi. The company, rooms and observations in this profile are invented. I do not claim real school contracts, improved learning results or a professional certification for the products. Engineering, materials, access, fire and other project-specific assessments remain with qualified owners. My role is to make the proposition clear enough that those responsibilities can be funded and carried through the product's development, rather than treat a compelling demonstration as a substitute for them.

Databank registration has not yet begun in my preparation record; I still need to complete the proficiency assessment and do not assert any exemption. I would initially examine twenty days of annual capacity for a first board role, subject to preparation, travel, employer consent and exceptional demands. The contribution I want to develop concerns the continuing commitments hidden inside a product promise. I would bring the reassembly mistake into that conversation because it shows how easily a leader can approve the visible moment and leave the less visible work to someone who was never part of the original decision.

Continued on the profile page →

Design the second life into the first product decision

I approved a modular-table proposition after watching a smooth first assembly. The demonstration made reconfiguration look like an inherent property of the product. Mary asked us to follow the tables through dismantling, packing and another assembly. In a selected fictional exercise involving thirty modules, eighteen retained a complete fitting set and twelve needed missing items replaced. The initial demonstration had not tested that part of the promise. I had treated an assembled object as evidence of a repeatable experience, leaving the next team to solve a problem the product brief had never owned.

I am Esther Qezvarli, the fictional CPO of Vazqelmi Learning Interiors in Imphal. Our 146-person practice records ₹54 crore FY2026 revenue from initial fit-outs, renewal and parts services. I lead nineteen product colleagues through three leads, reporting to Arun. Mary coordinates the design work with qualified engineering, materials and project owners. My remit is the product proposition and the resources required to develop it. It does not establish that an actual room meets building, fire or access requirements, or that a furniture choice improves anyone's learning outcome.

We committed ₹24 lakh to revise the relocation kit and its instructions, with technical assessment retained by the appropriate owners. Later decisions concern replacing a worn writing surface without automatically replacing a whole module, explaining compatibility across product versions, identifying units after room names change and declining a support-duration claim the supply account could not yet sustain. These are ordinary moments in a product's life, but they decide whether adaptability remains useful after the catalogue photograph. I want the narrative to show both the continuing value and the costs of making that promise credible.

A surface problem did not always require a whole new module

Forty selected service requests included twenty-seven concerning the writing surface and thirteen requiring wider assessment. The product brief developed a replaceable insert route while retaining qualified review of the frame, fittings and intended use.

A familiar family name did not settle compatibility

A review of fifty-four installed configurations found thirty-one with an approved adaptation route and twenty-three needing separate assessment. The new launch retained that distinction rather than imply that one family name meant every part was interchangeable.

The product needed an identity beyond its current room

Of seventy-two selected modules, forty-four still matched their room-based label and twenty-eight had moved. We separated permanent product identification from the changeable location account so the next service request could begin with the right unit.

Current focus

I am connecting product development with the parts, information and service capacity that a changing room needs after its initial installation.

Conversations I welcome

Product-portfolio and continuing-service discussions, including a carefully assessed first board opportunity.

From the desk of Esther

I want the word adaptable to describe work we have actually designed for. A product may assemble beautifully once and become difficult to move, identify or repair later. The brief should include those later moments, with their parts, instructions and responsibilities, before we ask a client to pay for the promise of a room that can keep changing.

— Esther Qezvarli

In this edition

Modularity and continuing use

The second assembly belongs in the modular product brief

A smooth first demonstration can leave dismantling, packing and reassembly undesigned. The promise of adaptability should include the work between visible configurations.

Modularity and continuing use · 2026-06-19 · 5 min read

Repair scope and portfolio design

The worn surface should not decide the fate of the whole module

A renewal proposition can offer a smaller intervention without pretending that every damaged item is repairable. Product leadership must design the assessment and support behind the alternative.

Repair scope and portfolio design · 2026-07-24 · 5 min read

Product support and continuing commitments

A support period is a product commitment before it is a headline

The proposed seven-year statement was more complete than its supply account. A continuing-use promise needs identified parts, information and responsibilities behind the duration.

Product support and continuing commitments · 2026-08-21 · 5 min read

Dispatches from practice

Case 01

Revising the modular promise after the first assembly had persuaded me

In 2018 I approved a modular-table proposition after a polished first assembly demonstration. The product looked straightforward to put together, and the launch account described it as suitable for repeated reconfiguration. Mary Qezvomri asked us to follow the next part of the journey: dismantling, packing, storing and assembling it again. In a selected fictional exercise with thirty modules, eighteen retained a complete fitting set and twelve needed missing items replaced. The first demonstration had shown that the product could be assembled under the conditions we supplied. It had not established that the whole relocation experience had been designed.

The launch sponsor wanted to preserve the timetable and add a reminder about careful packing. That would have kept the kit simpler and avoided another development round. I initially found the proposal reasonable because the missing items seemed like an operating issue. Mary argued that the product promise itself depended on those items reaching the next assembly. If the kit and instructions made their retention easy to overlook, the receiving team was being asked to complete design work we had excluded from the demonstration.

I accepted ₹24 lakh of revision work covering the relocation kit, component identification and the instructions for the intended sequence. Qualified engineering and materials owners retained assessment of the actual details; the commercial brief did not prescribe an improvised fixing or bypass a required check. We withdrew the broader repeatability claim pending the appropriate review. We did not describe the twelve incomplete sets as twelve unsafe tables, nor did we claim that the revised kit had already survived an unlimited number of moves.

The trade-off was a more involved kit and a delayed launch account. I had to explain why the approval I had given was narrower than the promise we were preparing to make. The useful lesson was not that people must always pack more carefully. It was that a product sold for change needs to account for what happens between its visible configurations. The case retains the expense and the unresolved technical work because a successful first photograph cannot stand in for the next user's ability to reconstruct the product responsibly.

Case 02

Giving the writing surface its own renewal route

In 2022 we reviewed forty fictional service requests involving learning-room modules. Twenty-seven concerned the writing surface, while thirteen required a wider assessment of the module. The existing renewal proposition began with a complete replacement unit. That was easy to quote and preserved a consistent appearance, but it did not ask whether every request required the same extent of work. A worn surface and a question about the frame or fittings were being channelled into one commercial answer before the relevant condition had been assessed.

The commercial lead preferred the complete-unit offer. A separate insert would create another item to identify, stock and support, and it might reduce replacement revenue. Mary wanted to explore a surface route without pretending that it could be used in every circumstance. We needed to retain the qualified assessment of the existing module and the compatibility of any replacement. The twenty-seven surface-related requests did not constitute twenty-seven automatic approvals for a new insert. They identified a product opportunity that deserved development and a clearer service decision.

I approved ₹43 lakh for the replaceable-surface programme and ₹9 lakh annual provision for the supporting parts account. The proposition distinguished a surface enquiry from a whole-module assessment and identified the design and service owners who could approve the appropriate route. We did not claim that the new part would restore every unit to an equivalent condition or that it removed the need for professional review. The frame, fittings and intended use remained relevant to the actual decision.

The consequence was a more complex portfolio and an additional continuing obligation. We gave up the simplicity and potential revenue of treating every request as a complete replacement. No waste-reduction percentage or customer saving is invented to make that choice look automatically superior. The recorded result is a developed renewal route with explicit assessment and stocking responsibilities. I want the product account to explain why a smaller replacement can be useful while retaining the work needed to make it the right replacement. Repairability has little practical value if the client can identify the damaged surface but cannot find a supported way to address it.

Case 03

Keeping the installed range inside the new-version launch

In 2023 a new product version was being prepared under an established family name. The launch material emphasised continuity, and commercial colleagues wanted to describe the new components as compatible with the installed range. A review of fifty-four fictional configurations found thirty-one with an approved adaptation route and twenty-three requiring separate assessment. The shared family name did not settle that difference. A client could reasonably understand the continuity claim more broadly than the technical account supported.

The launch team wanted one concise compatibility statement. A table of versions and conditions would make the release feel less seamless, and separate assessment might slow a renewal enquiry. Mary argued that the existing customer should not discover the distinction after ordering a part. I agreed that the product needed a clear account of continuity rather than a universal claim. The thirty-one approved routes also had conditions that needed to remain attached to them; approval was not a general invitation to combine any two parts that looked similar.

We committed ₹37 lakh to the compatibility account, identification material and the development work associated with the defined routes. The twenty-three unresolved configurations remained outside the automatic renewal path until the appropriate owner had assessed them. The launch description explained how a customer could identify the installed version and find the relevant route. We did not invent a universal adaptor or treat a photograph as a substitute for technical approval. Engineering, materials and project owners retained responsibility for actual suitability.

The decision reduced the simplicity of the launch and created work around older versions when the team wanted to focus on the new one. It did not establish that twenty-three configurations were defective or that all customers could eventually use the new components. The result was a more specific compatibility proposition with unresolved work visible. I regard the installed range as part of the product portfolio, not as an inconvenient historical exception. A new version should make its relationship with earlier commitments understandable, even when that makes the release less impressive than a claim that everything works with everything.

Case 04

Separating the module's identity from the room it happened to occupy

In 2024 a service review considered seventy-two fictional modules whose labels had been based on their original room. Forty-four still matched that location, while twenty-eight had moved. Staff requesting a part sometimes used the old room label and sometimes the new room name. The product had been sold for reconfiguration, but its identification system assumed that the original location would continue to describe the object. That made a later service request harder precisely when the customer had used the flexibility the proposition encouraged.

The service sponsor wanted to update room labels after each move. That would have preserved familiar language for the client and avoided a different identifier. Mary asked what would happen when one room contained several versions or when a module moved again before the record was updated. I supported separating the stable product identity from its current location. The aim was not to remove the room name, which remained useful for finding the object. It was to stop the room name from carrying a technical identification role it could not reliably retain.

A ₹19 lakh programme developed durable product identification and a separate, changeable location account. The relevant owners reviewed how the identifier would be attached and read in the intended conditions. The service process used it to locate the appropriate product record before assessing a parts request. It did not turn an identifier into proof of current condition, correct assembly or entitlement to a particular repair. The actual module still needed the assessment appropriate to the request.

The cost was another piece of information for teams to maintain and explain. We did not claim that service errors had fallen by a measured percentage or that every historical unit could be identified immediately. The seventy-two-module review supported a design change, not a universal performance result. The case changed how I think about reconfigurable products: information must move with the object while remaining able to describe its changing context. A product that can leave its original room should not lose its identity when it does so.

Case 05

Declining a seven-year support line before the supply account could sustain it

In 2025 the proposed portfolio material included a seven-year support statement. It was attractive because clients wanted confidence that a room could be maintained after the initial fit-out. The product team intended to support the range, but a review of six relevant supply arrangements found four with a documented parts-continuity basis for the proposed period and two still unresolved. The intended promise had reached the copy before the supporting account was complete. We needed to examine what the enterprise was actually prepared to commit to, rather than let a duration become a substitute for that work.

The commercial sponsor wanted to keep the headline while procurement completed the remaining discussions. Removing it would weaken the new proposition and make the practice appear less confident than competitors. Procurement and service colleagues warned that an intention to find a part later was not equivalent to a supported arrangement now. I supported narrowing the statement to the parts and conditions the enterprise could substantiate, with legal and commercial owners reviewing the actual commitment. The four documented arrangements did not automatically cover every item or every kind of request.

We allocated ₹29 lakh to the product-support review and ₹12 lakh annual provision for the bounded parts and information account. The two unresolved arrangements stayed outside the broad claim until their position could be established. The revised material explained how the supported scope would be identified and where a request required further assessment. It did not offer a universal seven-year promise, and it did not imply that the website itself created or replaced the terms of a real agreement.

The consequence was a less striking launch line and continuing work behind a narrower offer. No renewal uplift or avoided-loss figure is invented. We gave up the apparent certainty of one duration because the operating evidence did not yet support it across the range. My lesson is that a product promise has a supply and service history even before it reaches the customer. A CPO should bring those owners into the proposition early enough that confidence comes from the commitment the enterprise can sustain, rather than from how long a number looks in the brochure.

The full record of leadership work →

Letters to the editor

“In this fictional portfolio review, Esther kept the parts and service account beside the proposed support duration. She accepted a less striking claim when the evidence did not cover the whole range, rather than ask future teams to invent the missing commitment after launch.”
Arun Tevqazli, Fictional CEO, Vazqelmi Learning Interiors
“This invented account concerns the modular-table proposition. Esther accepted that the first assembly she had approved did not describe the whole relocation experience, and funded the work between configurations instead of treating missing fittings as somebody else's unexplained problem.”
Mary Qezvomri, Fictional design lead, Vazqelmi Learning Interiors

An invitation

Contact

Product-portfolio and continuing-service discussions, including a carefully assessed first board opportunity.

Open to
  • Board appointments
  • Advisory roles
  • Speaking invitations

office@estherqezvarli.example