Skip to website
Nandita VaikunthanChief Human Resources Officer
Portrait of Nandita Vaikunthan
Chief Human Resources Officer

An introduction

The work moves before the megawatts do


Our move from coal to sun and wind changes who does the work, where they live and which hours they can safely keep.

India

Open to Board appointments

Start a conversation
My approach

A technician's shift is the smallest unit of an energy transition. Megawatts move on a planning chart in a single board meeting, while the people who will run them have to change their skills, their towns and sometimes the hours their bodies can tolerate. I try to give those people real choices early, with the costs written down before anyone is asked to decide.

Company revenue
₹2,940 Cr
Year ended March 2026
Direct employees
2,140
Plus an average 3,900 contract workers on site
Renewable capacity operated
1,450 MW
Alongside a 600 MW coal-fired station

Work worth discussing.

01Moving summer module cleaning out of the afternoon at Phalodi and Kutch

In the 2022 summer our contract cleaning crews, about 640 workers across seven parks in Rajasthan and Gujarat, reported 41 cases of heat-related illness. Cleaning ran from 8 am to 4 pm with water breaks, a pattern carried over from our first park.

I proposed moving all summer cleaning into two shifts, 4 am to 10 am and 6 pm to 11 pm, and stopping non-emergency outdoor work between noon and 4 pm from April to June. The head of renewable operations disagreed strongly. Night work meant cable trenches, snakes and poor visibility near live strings, and he doubted cleaning quality in the dark. Finance objected to the cost. Two contractors were uneasy about women cleaners on evening shifts and the safeguards that would require.

We piloted the pattern at two parks in 2023 before extending it. The changes included head torches and fixed block lighting, marked walking routes, snake-bite kits and trained responders at every shift, and transport home after each shift. Women workers chose their shift, and most chose mornings. Heat-index readings were taken hourly at the blocks.

The trade-off was real. Cleaning cost per megawatt rose 14 per cent, about ₹1.9 crore a summer. In the dustiest weeks, cleaning cycles stretched from twelve days to fifteen, and operations estimated a 0.4 per cent generation loss at those parks in May. The managing director approved the change on the condition that we report those losses each year.

Reported heat illness fell to 17 cases in 2023 and 9 in 2024, then rose to 11 in the hotter June of 2025. Summer turnover in the cleaning crews fell from 38 per cent to 19 per cent. The heat plan is now written into our cleaning contracts.

I would ask the crews before designing the shifts next time. We learnt only later that many cleaners wanted a longer morning shift because of household work in the evening. I would also have used the heat index from the start rather than shade temperature.

02Retraining station technicians while the station still needed them

In 2023 the Chhattisgarh station employed 760 people with an average age of 41. The board had decided in 2022 to build no further coal capacity. At the same time, the parks needed about 260 more operations staff by 2027.

I proposed a voluntary programme for station technicians under 48: nine months of training in inverters, plant control software, substation work and module diagnostics, three months on a working park, then a transfer with a relocation allowance, help with school admissions and job-search support for spouses. Anyone who transferred could return to an equivalent station role within a year. The station head feared losing his best electricians before the 2025 overhaul. The union wanted assurance that nobody would be pushed. The chief financial officer preferred hiring near the parks, where salaries were about 18 per cent lower, and considering a voluntary retirement scheme later.

We agreed to release people in three batches capped at 40 each, so that the station could plan its overhaul. The renewables business accepted slower staffing and kept transferred employees at their station salary, which costs about ₹3.2 crore a year more than local hiring would have. The programme itself cost ₹11.8 crore over two years.

Of 126 applicants, 94 completed the training and 71 transferred. Nine returned to the station within the year. Station availability held at 86 per cent, although the 2025 overhaul needed more contract specialists than planned. Transferred technicians now make up 30 of the 46 people in operations roles at Koppal, where the battery system is being built.

The station's future is now discussed with its employees as a set of choices rather than a rumour. The 23 who completed training but stayed at the station have skills they can use if its life ends sooner than 2035.

I would involve families earlier. Of those 23, 14 cited a spouse's work or their children's schooling. Next time I would hold family sessions in the township before applications open, not after the training ends.

03Setting a contract technician wage floor at the junior permanent grade

By 2024 about 430 contract maintenance technicians, engaged through six contractors, worked beside 210 junior permanent technicians on the parks. Their duties overlapped closely, but their basic wage was about 31 per cent lower. Twelve-month attrition among contract technicians was 46 per cent, and an audit found two contractors paying more than three weeks late at remote sites.

I proposed that from April 2025 each contractor pay matched-duty technicians at least the basic wage of our junior permanent grade, by bank transfer before the seventh of each month, with monthly sampling of wage registers against our attendance records. The finance and procurement heads objected to the cost and asked whether matching wages would invite claims that the contract arrangement was not genuine. We took legal advice on how to define the duties and supervise the contractors. The operations head preferred converting the best contract technicians to permanent roles and leaving the rest unchanged.

We did both, in part. The floor covers basic wage only, not allowances or benefits, so a gap of about 12 per cent in total pay remains. We also filled 38 permanent vacancies through open selection, which contract technicians could enter. Revised contract rates cost ₹7.4 crore a year, and margins fell on two supply contracts priced before the change. Two of the six contractors left rather than accept the audits, and replacing them took four months.

Twelve months later, attrition among contract technicians had fallen to 22 per cent. Average time to restore an inverter fault fell from 9.5 hours to 6.8. Operations attributes part of that improvement to retained experience and part to better spares. No late payment has been found since the audits began.

The wider change is that contractor selection now gives as much weight to payroll evidence as to price.

I would publish the matched-duty definitions to the technicians themselves. Many heard about the change through rumour, and two contractors briefly reclassified duties to avoid the floor before our audits found it.

I plan a power company's change of fuel as a change in who does the work, where they live and which hours of the day are safe to work.

I lead human resources at Oruvanthi Power Limited, a family-promoted unlisted public company headquartered in Hyderabad. We own a 600 MW coal-fired station in northern Chhattisgarh and operate 1,450 MW of solar and wind-solar hybrid parks in Rajasthan, Gujarat and Karnataka. Revenue for the year ended March 2026 was ₹2,940 crore. The company employs 2,140 people directly, and an average of 3,900 contract workers are engaged on our sites through licensed contractors. I report to the managing director and lead 62 colleagues in the people function.

The station and the parks offer very different working lives. A boiler technician in Chhattisgarh lives in a plant township with a dispensary, a school and a recognised union. A technician at a park near Phalodi may be forty kilometres from the nearest town, on a site where May afternoons pass 45°C. In 2022 our board decided not to add coal capacity. The station keeps running under its power purchase agreement until 2035, but its younger employees can no longer assume the next twenty years will look like the last ten. Much of my work is making that change visible early enough for them to choose.

I began in 1998 as a personnel officer on substation erection camps, then worked at a sugar mill, a gas-fired station and a wind-turbine service company before joining Oruvanthi in 2016. Seasonal cane workers showed me how contract labour is actually recruited. A gas station running at part load showed me what idle skilled people need from management. Wind technicians showed me that remote work breaks down over travel, rest and family long before it breaks down over pay.

Summer cleaning moved out of the afternoon

From the 2023 summer, module cleaning at our Rajasthan and Kutch parks ran in two shifts, 4 am to 10 am and 6 pm to 11 pm. Reported heat-related illness among cleaning crews fell from 41 cases in 2022 to 9 in 2024. Cleaning cost per megawatt rose 14 per cent.

Station technicians retrained before they were surplus

Of 126 station employees who applied for renewable operations training in 2023, 94 completed it and 71 accepted transfers to the parks. Nine returned to the station under a one-year right to return. Station availability held at 86 per cent while the batches were away.

One base wage for matched technician duties

Since April 2025 our contractors must pay contract maintenance technicians at least the basic wage of our junior permanent grade for the same duties. The floor costs ₹7.4 crore a year. Twelve-month attrition among those technicians fell from 46 per cent to 22 per cent.

Current focus

I am preparing the people plan for our first battery system, 150 MWh under construction at the Koppal park: who will operate it, how its fire and electrical hazards will be trained for, and whether station electricians can move into those roles.

Conversations I welcome

I would welcome a first independent directorship with a manufacturing, mining, construction or power company whose workforce sits largely on remote plants or sites. I have 24 days a year available, subject to my employer's consent and a review of commercial relationships.

The leadership record

Trusted with consequential decisions.

Formation

  • Master's degree in personnel management and industrial relationsVellivakkam Institute of Labour Studies · 1998
  • Bachelor of arts in economicsThiruvarnam College of Arts and Science · 1996
When the board stopped adding coal, Nandita was the first executive to ask what we owed the station's thirty-year-olds. She brought costed options rather than sentiment, and told us plainly which ones she could not yet staff.
Arvind ThimmarajuManaging director and CEO, Oruvanthi Power Limited
The full record ↗

Contact

I would welcome a first independent directorship with a manufacturing, mining, construction or power company whose workforce sits largely on remote plants or sites. I have 24 days a year available, subject to my employer's consent and a review of commercial relationships.

  • Board appointments