Room for One Whole Frame
CTO
A capture-board CTO must show whether one entire frame fits the physical address map before quoting a larger image mode.
The signature device
A 128 MiB map has 64 MiB free in three holes, but none can satisfy a single contiguous 48 MiB capture request.
Who should choose it
For a technology chief whose investment case depends on what the installed hardware can actually address in a long-running session.
Who it puts first
Board or NRC chairInvestor or PE partnerThe referee
CXO and MD · Data-led · 2 A4 pages


The design, and its plain companion.
Room for One Whole Frame, as designed
2 A4 pages, printed as you see them, in real selectable text.


Sanjana Velnqeri, the companies and the institutions on this page are fictional. A commissioned document carries only your own facts, and every figure is one you have confirmed.