Room Around the Mark
Director of Engineering
An engineering director can settle a packaging dispute by showing the clear margin that belongs to a readable symbol alongside the printed modules.
The signature device
A genuine twenty-one-module QR symbol sits inside four clear modules on each side, giving a fourteen-and-a-half-millimetre footprint at the sample pitch.
Who should choose it
For a reader engineering head who can reconcile a packaging designer’s artwork with an acceptance test on the actual converting line.
Who it puts first
The refereeSearch partnerCHRO or head of talent
Director and Head · Portrait-led · 2 A4 pages


The design, and its plain companion.


Devika Qelrnashi, the companies and the institutions on this page are fictional. A commissioned document carries only your own facts, and every figure is one you have confirmed.